{"id":2504,"date":"2024-05-19T07:40:39","date_gmt":"2024-05-19T05:40:39","guid":{"rendered":"https:\/\/strategicmp.pl\/programma-prioritario-cogenerazione-per-il-settore-industriale-ed-energetico-del-fondo-di-modernizzazione\/"},"modified":"2025-01-17T12:13:14","modified_gmt":"2025-01-17T11:13:14","slug":"priority-programme-cogeneration-for-industry-and-energy-sector-from-the-modernization-fund","status":"publish","type":"post","link":"https:\/\/www.strategicmp.pl\/en\/priority-programme-cogeneration-for-industry-and-energy-sector-from-the-modernization-fund\/","title":{"rendered":"Priority Programme &#8220;Cogeneration for Industry and Energy Sector&#8221; from the Modernization Fund ."},"content":{"rendered":"<p><strong>Purpose of the program<br \/>\n<\/strong>Promoting the use of high-efficiency cogeneration for industry. The programme will contribute to the climate and energy framework goals set at national level and the long-term goals set out in the Paris Agreement .<\/p>\n<p><strong>Application Deadline<br \/>\n<\/strong>on a continuous basis from 22.04.2024 to 19.12.2025 or until the allocation of funds is exhausted .<\/p>\n<p><strong>Type of co-financed investments<br \/>\n<\/strong>Investments related to the construction and\/or reconstruction of generating units with a total capacity (electric + heat + cooling) installed not less than 0.5 MW, operating in high-efficiency cogeneration conditions (excluding energy generated in a coal-fired cogeneration unit) together with their connection to the transmission network, in which the following are used to produce energy: waste heat, energy from renewable sources, gaseous fuels, gas blends, synthetic gas or hydrogen.<\/p>\n<p><strong>Form of support :<\/strong><span>\u00a0<\/span>Grant and\/or loan<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Purpose of the program Promoting the use of high-efficiency cogeneration for industry. The programme will contribute to the climate and energy framework goals set at national level and the long-term goals set out in the Paris Agreement . Application Deadline on a continuous basis from 22.04.2024 to 19.12.2025 or until the allocation of funds is&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18],"tags":[],"class_list":["post-2504","post","type-post","status-publish","format-standard","hentry","category-news-en"],"_links":{"self":[{"href":"https:\/\/www.strategicmp.pl\/en\/wp-json\/wp\/v2\/posts\/2504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.strategicmp.pl\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.strategicmp.pl\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.strategicmp.pl\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.strategicmp.pl\/en\/wp-json\/wp\/v2\/comments?post=2504"}],"version-history":[{"count":0,"href":"https:\/\/www.strategicmp.pl\/en\/wp-json\/wp\/v2\/posts\/2504\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.strategicmp.pl\/en\/wp-json\/wp\/v2\/media?parent=2504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.strategicmp.pl\/en\/wp-json\/wp\/v2\/categories?post=2504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.strategicmp.pl\/en\/wp-json\/wp\/v2\/tags?post=2504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}